Slide 1

     Home » Modern design flooring » Education » Laboratories » GTVS Elsa Bienenfeld-Weg 21

GTVS Elsa Bienenfeld-
Weg 21

FLOORING > KAYAR

Wien

PROJECT Atelier Kohlbauer

PHOTOS michael schmid

previous arrow
1
2
3
4
5
6
next arrow
The construction area of ​​the school building is around 1,000 square meters. The schools is designed for a 17-class, cluster-based, full-day elementary level for 400 pupils. The building consists of a ground floor, four upper floors, an attic and two basement floors. The main entrance to the school is next to the “Zuckerlhaus” and allows quick access to the subway station. The entire access to the school building is barrier-free. The energy efficiency of the building was evaluated in a thermal building simulation in order to determine consumption in a user-friendly and targeted manner. The elementary school is connected to a plant that supplies heating and cooling from fossil-free energy sources. The system brings together renewable energy sources such as geothermal probes, wastewater heat utilization, groundwater utilization and air heat exchangers. In addition, a photovoltaic system makes this school climate-fit.

RELATED PROJECTS

CONTACT US!

The Privacy Policy of the website, drafted by Artigo S.p.A.- Single-Member Company, as Data Controller, has been read and accepted, in order to reply to your request.

"*" indicates required fields

The Privacy Policy of the website, drafted by Artigo S.p.A.- Single-Member Company, as Data Controller, has been read and accepted, in order to reply to your request.
Newsletter
This field is for validation purposes and should be left unchanged.